What is the IDS? LOSOM postponed?

Last week was a big week for Everglades restoration. Today I will share two important  “informationals” that you may have missed. Both announcements were made last Friday, October 29, 2021.

I.

IDS- Integrated Delivery Schedule Final 2021, Army Corps of Engineers. 2021 SFER Integrated Deliver Schedule_Final Draft_29 October 2021. This colorful and somewhat overwhelming chart is updated each each year as a timeline for the Central and Southern Florida Comprehensive Everglades Restoration Plan, or CERP.

The St Lucie and Loxahatchee watersheds as well as the EAA Reservoir are all noted on this schedule. The big recent additions are the C-23/C-24 Reservoir/STA components in St Lucie County and the Loxahatchee River watershed in southern Martin and Palm Beach counties. The C-44 Reservoir -that has been on the IDS for many renditions- is located in Indiantown and will be going on-line this year as the first completed major CERP project!

To study this chart, click on link above, familiarize yourself with the key at the top, note color coding by timeframe/Congressional approval, and type. It’s pretty cool once one figures out how to read it!

-Excerpt with Indian River Lagoon South’s C-23/C-24, C-44 etc…-Excerpt Loxahatchee River just authorized in WRDA 2020

Click here to see all slides from the ACOE’s IDS presentation: Public Engagement Workshop_IDS Final Draft_29 October 2021

II.

LOSOM – Lake Okeechobee System Operation Manual

By now you have certainly heard of LOSOM (Lake Okeechobee System Operation Manual) that is replacing LORS (Lake Okeechobee Regulation Schedule.) If you haven’t, basically the operation schedule for Lake Okeechobee is being updated in line with the anticipated completion of improvements of the Herbert Hoover Dike.

For over two years, the ACOE has patiently taken input from stakeholders and the public. They had originally expected to announce their final output on November 2, 2021, but have decided to postpone their final announcement until November 16, 2021. Why did they postpone? Read here:  ACOE LOSOM press release. Even after November 16th the process will continue as the operations manual is written. LOSOM is on the IDS above and listed as a “Non-CERP” project (light blue at top.)

A lot of exciting things are happening for the St Lucie and for the Greater Everglades. Most definitely there is a reason for hope.

Keep the pressure on, be empathetic to all, and never forget how hard we have worked since 2013.

-River Kidz art contest 2013. Winner TCPalm competition.
-Rio, St Lucie River, Jeff Tucker, toxic algae 2016
Algae pouring into St Lucie River  from Lake Okeechobee  at S-80, 2016. JTL

-Lake Okeechobee at Port Mayaca and C-44 Canal 2018. Photo JTL/EL

Alligators have lived on Earth for millions of years, but they shouldn’t have to put up with this!

 

Why #SupportJoeNegron ‘s EAA Reservoir? Because it Should Have Already Been Built! SLR/IR

Image 1-8-17 at 3.50 PM.jpg
CEPP, 2000.
img_9231-version-2
“A1” Reservoir was never built but rather the A1 Flow Equalization Basin instead

In my opinion, one should support Senator Negron’s controversial land purchase to build an EAA Reservoir, because the Reservoir should have already been built. It is a project that has been expected for almost two decades.

A summary–

Due to water quality lawsuits against sugarcane growers, during the 1980s and 90s, the State of Florida had to build six Storm Water Treatment Areas to clean runoff water using Everglades Agricultural Area land, taking valuable sugarcane out of production. (Orange shows STAs) Unfortunately, the industry brought this upon itself as for many years its water runoff had been polluting Everglades National Park and Tribal Lands.

.STA

The problem was so bad, that on top of the Stormwater Treatments Areas, Congress appropriated the beginnings of the Comprehensive Everglades Restoration Plan. Yes, “CERP” has a plan for  “EAA Storage.” A Reservoir, to be the heart of clean water flowing south. (See 4 down left of image below)  CERP (https://www.nps.gov/ever/learn/nature/cerp.htm)
image-1-8-17-at-3-50-pm

Ev. Restoration.gov:http://141.232.10.32/pm/projects/proj_08_eaa_phase_1.aspx

At the beginning of CERP it was determined that the Reservoir/s were to be built near Stormwater Treatment Areas between the Miami and New River Canals. Although they tried, the SFWMD and ACOE never got very far building the Reservoir/s and, you’ll notice “EAA Storage” is still listed on the ACOE calendar of projects, scheduled to begin in 2021. (http://evergladesrestoration.gov/content/cepp/meetings/012512/Recap_EAA_Reservoirs.pdf)

fullsizerender-2
This shows an area of the EAA Reservoir/s proposed between the Miami and New River Canals.

“Why?” You might ask, “didn’t the EAA Reservoir/s get built ?”

ACOE’s IDS or Schedule of Projects: http://www.saj.usace.army.mil/Missions/Environmental/Ecosystem-Restoration/Integrated-Delivery-Schedule/

IMG_3459
Close up of latest ACOE IDS schedule. EAA Storage in white.

The Reservoir/s did not get built because Gov. Charlie Crist’s proposed an idea of US Sugar’s to purchase all of United States Sugar Corporation’s land. This did not work out, induced a halt to the building of the Reservoir, and caused great discord with the Water Management Districts and the state Legislature.  The Great Recession also made the full purchase very difficult.(http://www.nytimes.com/2010/03/08/us/08everglades.html)(http://articles.sun-sentinel.com/2009-09-11/news/0909100559_1_everglades-restoration-reservoir-construction-reservoir-project)

Then on top of the US Sugar and the Recession situation, a Federal law suit that had been dragging on for years was settled and really changed things for the Reservoir/s. In 2010, Governor Rick Scott, “negotiated” a long-standing EPA law suit agreeing that the state of Florida would build more water quality projects to clean sugarcane runoff in the EAA that continued to destroy fauna and pollute Everglades National Park. This “fix” became known as “Restoration Strategies.”(https://www.sfwmd.gov/our-work/restoration-strategies)

Restoration Strategies supplanted CERP’s unfinished EAA Reservoir, building a Flow Equalization Basin instead. Mind you, a shallow treatment area is not a true Reservoir.(https://www.northstar.com/wp-content/uploads/2016/11/SFWMD-EAA-A-1-Flow-Equalization-Basin.pdf)

Now for one last thing…

Just recently, in December of 2016, Congress authorized CEPP. CEPP consist of  six components of CERP mentioned earlier. One of CEPP’s components is the “EAA Reservoir.” This sounds great, but….

CEPP, if appropriated, will not build a Reservoir but yet another Flow Equalization Basin to be located right next to Restoration Strategy’s “A1 Flow Equalization Basin.” This new Flow Equalization Basin will be called the “The A2.” (http://www.saj.usace.army.mil/Missions/Environmental/Ecosystem-Restoration/Central-Everglades-Planning-Project/)

So in conclusion, neither Restoration Strategies nor CEPP will provide the Reservoir that was underway before everything changed in 2008, nor will their water come close to adding up to “a Reservoir.”

Supporting Joe Negron’s land purchase of 60,000 acres is the ground work for building a Reservoir that should have already been built!

#SupportJoeNegron

Support the completion of the EAA Reservoir!

(http://www.miamiherald.com/news/local/environment/article94667592.html)

  • file-page1.jpgThe ACOE has EAA Storage on their construction schedule for 2021. By 2021 the estuaries will surly be dead.file-page1-2

Joe Negron & The EAA Reservoir, Escaping the ACOE’s IDS Tar-Pits, SLR/IRL

IMG_3470
ACOE Integrated Delivery Schedule 2015

 

IMG_3459
EAA Reservoir in white section-Planning Phase Proposed

 

Recently, Senator Joe Negron proposed as part of his goal-set as incoming Senate President the purchase of lands in the Everglades Agricultural Area south of Lake Okeechobee. The  idea of a reservoir is not a new one, but is certainly an idea whose “time has come.” To have the Present of the Senate supporting this idea is unprecedented!

As we move forward, it is important to know that this concept has been “on the books” since the beginning of Everglades restoration and is doable. We have all been really fighting for land since 2013, but the Comprehensive Everglades Restoration Plan took shape in 2000. Unfortunately is not taking shape very quickly as it is caught in the tar-pits of government and can’t seem to break free.

So now we the state must take leadership.

The chart I want to share with you– in case you are unfamilar —so you can see the “tar-pit”— has a confusing name.

It is called the “Integrated Delivery Schedule” or (IDS).

But what does that mean?

The Army Corp of Engineers “IDS” as seen above, in many colors, is like a goal sheet, but because there are so many moving parts going on simultaneously and they because they are dependent on each other, the chart is multi-dimensional rather than just “one, two, three.” Nonetheless, the projects are “in order”…just think of it as a “list of things to do” from top to bottom…as the money comes in and the ACOE tries to get things done between politicians and stakeholders fighting.

OK to stick on point, I want to call attention to the bottom of the sheet. Third from the bottom in white you will notice a line that reads: “EAA Storage & ASR/Decomp Ph2.”

IMG_3459

EAA storage is referring to water storage for Lake Okeechobee in the EAA; ASR is an entire other subject–like deep injection wells in the aquifer to store and retrieve water. Obviously the two concept were seen to work together.

It is all very complicated and I will write more about it in the coming months, but Senator Negron’s proposal has the potential to put the EAA reservoir higher up on the list, save the St Luice River/Indian River Lagoon, promote faster Everglades Restoration and pull us out of the tar-pits.

I for one am very thankful to Senator Negron, and I plan on pulling this Mammoth out by his tusks! 🙂

Jacqui

6mammoth-tar-pits1957-1.jpg
La Brea Tar Pits,CA

 

Here are some insightful links on the subject.

1. “Florida Audubon 2016: The Role of the EAA in Everglades Restoration Storing water in the EAA is one of the central components of the Comprehensive Everglades Restoration Plan (CERP). The EAA Reservoir project in CERP sought to hold water from Lake Okeechobee and farm runoff in the wet season and release this water south in the dry season. A er leaving the reservoir, freshwater would move through the network of man-made filter marshes called Stormwater Treatment Areas to remove phosphorus and other nutrients that are harmful to the plants and wildlife before continuing its path through the Central Everglades, Everglades National Park, and Florida Bay. Although an initial plan for the EAA Reservoir project was developed, the project was not constructed. The original location on for the project is now being used for two shallow water storage structures known as Flow Equalization on Basins (FEB). One FEB is part of the Central Everglades Planning Project (CEPP) project while another is part of the State of Florida’s Restora on Strategies plan required to meet water quality standards. These are important projects, but as recognized in the CEPP plan, the EAA Reservoir project is s ll necessary to achieve the goals of restoration on.1 There is an urgent need for state and federal agencies to come together to plan for water storage in the EAA.”
(http://fl.audubon.org/sites/g/files/amh666/f/audubon_eaa_reservoir_may2016.pdf)

2. Everglades Restoration (http://www.evergladesrestoration.gov/content/cepp/meetings/012512/Recap_EAA_Reservoirs.pdf)

3. AWRA Conference 2002, EAA Reservoir: (http://infohouse.p2ric.org/ref/33/32652.pdf)

4. ACOE:
ACOE EIS: https://books.google.com/books?id=1Do0AQAAMAAJ&pg=PP5&lpg=PP5&dq=EAA+reservoir+abstract&source=bl&ots=Dzbx9WhjvA&sig=2zyM1N1nfIgv1f9xtitaztXQFIw&hl=en&sa=X&ved=0ahUKEwj98s7S9MrOAhWEPB4KHRVIB44Q6AEIPTAF#v=onepage&q=EAA%20reservoir%20abstract&f=false

ACOE Integrated Delivery Schedule http://www.saj.usace.army.mil/Portals/44/docs/Environmental/IDS/IDS_PLACEMAT_Revised_February2016_web.pdf

IMG_3083 2
Senator Joe Negron announces his goal to purchase land in the EAA 8-9-16 (River Kid, Evie Flaugh stands nearby)

 

IMG_3067 3
Negron map of possible areas for land purchase