Tag Archives: tour with Florida Sportsman SFWMD

A Fly-over, a Field Trip, and Watching the Governor Activate the C-44 STA

Google Map area of C-44 Reservoir and STA in Indiantown, FL, Martin County.

Work on the C-44 Reservoir and Storm Water Treatment Area started back in 2004 and is one of a few gigantic water projects of the Army Corp of Engineers and South Florida Water Management District. The mammoth construction site is part of the Comprehensive Everglades Restoration Plan, Indian River Lagoon South. In Martin County, the foundation for this was laid back in 1996 and 1998, and then again in 2006 when the public supported environmental land purchases through a sales tax: https://www.martin.fl.us/land-acquisition

There were years of planning and design with stops and starts. Time has gone by and when funding has been in place, the Army Corp of Engineers has been building the reservoir (since 2015) and the South Florida Water Management District has been building the storm water treatment area (since 2014) : https://www.saj.usace.army.mil/Missions/Environmental/Ecosystem-Restoration/Indian-River-Lagoon-South/

Recently, the SFWMD has made great progress for water quality projects with strong backing from the public (fed up with toxic algae blooms), Governor Ron DeSantis and the Florida Legislature.

Today I will be sharing three things: a flyover with my husband Ed; a field trip led by the SFWMD to C-44 with Florida Sportsman Magazine; and the grand finale, the visit of Governor Ron DeSantis to allow the first waters of the C-44 Canal to flow into the STAs.

Why has everything taken so long? We’ll there are many reasons but we must note the 2008 Great Recession, politics, and most of all, the project’s size!

The map above and below can give you an idea of the project’s 12, 000 acres!

Years ago, I wrote a post about the Minute Maid Groves that were once on this property and shared awesome photos my mother gave me from 1964. Groves to Water, amazing how times change: “A Look Back to the Orange Groves of Today’s ACOE SFWMD C-44 Reservoir/STA, 1964, SLR/IRL” https://jacquithurlowlippisch.com/tag/c-44-storm-water-treatment-area-and-reservoir/

Looking at the Google Map, you’ll notice that you can easily see the outline of the former groves. Perusing the map below, you can see the reservoir will be in the north west corner and the six cells of the storm water treatment area on the east. You will also notice that Allapattah Flats, once a gigantic marsh through St Lucie and Martin County, is north of the project along with Troup’s – RB Ranch – upper east. Star Farms is west and grows sugar cane at the present time. There is a long intake canal off the C-44 canal that brings in the polluted water – primarily from local farm runoff. 2/3 of Martin County is agricultural. It is important to keep these lands in agriculture as developed lands would be even harsher on the  wildlife and the environment. We all, coast or inland, must work to clean things up!

 

SFWMD map of site
  1. FLYOVER C-44 RESERVOIR & STA,  ED LIPPISCH and JTL, SUNDAY, NOVEMBER 10, 2019.

 

on Sunday, November 10, Ed and I flew over and took aerial photos. Below you can see the airplane over the reservoir looking over the cells of the storm water treatment area. Also note the long intake canal to the C-44 Canal.
Looking over Cell 2 C44 STA

2. FIELD TRIP TO C-44 RESERVOIR & STA WITH FLORIDA SPORTSMAN MAGAZINE, and JTL led by Alan Shirkey, Bureau Chief, Engineering and Construction, SFWMD and Buff Searcy, Lead Engineer and Construction Manager, SFWMD. THURSDAY, NOVEMBER 7, 2019. This was a great opportunity and thank you to Blair Wickstrom for recommending we do such from the ground. This is were one really sees what is going on!

 

Entrance sign along Citrus Road in Indiantown
On Thursday, Blair Wickstrom and Tray Wheeler of Florida Sportsman Magazine and myself took a tour or the property and really got to see it from the ground.  Buff Search, JTL, Blair Wickstrom, Alan Shirkey
Pumps pull in water from below
Buff Searcy, Lead Engineer, Alan Shirkey, Bureau Chief SFWMD, Florida Sportsman publisher, Blair Wickstrom, reporter Tray Wheeler. Large gate strains.
Buff Searcy, Lead Engineer SFWMD with reservoir dike in background.
Buff Searcy, Blair Wickstrom, Tray Wheeler, Alan Searcy discuss…
Indigo Snakes are an endangered species and live in this area
The wildlife was most interesting to me as many types were in the area. We saw numerous deer resting in the grass. I was assured they would move when the reservoir and STA were up and running. It pains me they do not have more wild habitat.
Signs regarding threatened/endangered eastern indigo snake
Alan Shirkey explains the reservoir and STA.

 

3. GOVERNOR DESANTIS ACTIVATES THE C-44 STA, INDIANTOWN, FRIDAY, NOVEMBER 8, 2019. A great day and an honor for me to be there up close to our wonderful new Governor!

“The SFWMD recently completed three of the six cells of the 6,300-acre treatment area and expects to have the entire STA completed next year. The U.S. Army Corps of Engineers is building a 3,400-acre reservoir next to the STA that is expected to be completed in 2021.
The C-44 Reservoir will store 50,000 acre-feet of water, including local basin runoff and Lake Okeechobee releases. This will reduce harmful releases reaching the St. Lucie Estuary that can fuel harmful algal blooms. The C-44 STA will treat the water stored in the reservoir before it is released into the estuary.
“I can’t help but smile. Water flowing into this treatment area marks a momentous day in the history of the Everglades, the Treasure Coast, and the St. Lucie Estuary,” said SFWMD Governing Board Member Jacqui Thurlow-Lippisch. “This is the start of the road to a healthier estuary and Everglades. Under the leadership of Governor DeSantis, progress on Everglades restoration is moving at a rapid pace.”” 

Please see Press Release from the Governor’s Office: Governor Ron DeSantis Activates C-44 Stormwater Treatment Area

Cleaner water coming to St. Lucie River, Indian River Lagoon as SFWMD opens C-44 project, by Tyler Treadway:https://www.tcpalm.com/story/news/local/indian-river-lagoon/health/2019/11/08/water-pumped-into-sta-desantis-celebrates-lake-o-project-indiantown/2506354001/
The Governor hits the button and the first waters flow into the C-44 STA. It can take months for these to slowly fill. Later plants (mostly cattails) will grow and filter water before from the Reservoir before it goes back into the C-44 Canal and St Lucie River.
Water entering the STA
People gather to await the governor!
.
.
.
.
.
.
Gov. DeSantis speaks, photo Carolyn Timmann
Carolyn Timmann and Alan Shirkey stand before cell 2 of the C-44 STA as water enters for the first time
.

Former posts on C-44 Reservoir and STA

October 13, 2014: Seeing Results C-44: https://jacquithurlowlippisch.com/2014/10/13/seeing-results-c-44-storm-water-treatment-areareservoir-st-lucie-river-indian-river-lagoon/

Sept 15, 2015: Reaching the Finish Line: https://jacquithurlowlippisch.com/2015/09/15/reaching-the-finish-line-c-44-storm-water-treatment-areareservoir-slrirl/

October 29, 2015: A Look Back to the Orange Groves of Today’s ACOE SFWMD C-44 Reservoir/STA, 1964, SLR/IRL https://jacquithurlowlippisch.com/tag/c-44-storm-water-treatment-area-and-reservoir/