Tag Archives: The space jellyfish effect – twilight phenomenon

Space Jellyfish Effect and our IRL

The space jellyfish effect – twilight phenomenon, video below.

Finito, Indian River Lagoon, Cocoa Village, FL, 10-13-26

Captain Ed awoke me at 6:15 AM. We had overnighted at Cocoa Village Marina on our return to Stuart.

“Will you walk Diesel”, he asked.

“Sure”,  I replied. “Did the rocket go off yet?”

“Not yet, in fifteen minutes”.

I laid in bed as long as possible and then stumbled to the kitchen. Coffee was already brewing and Diesel was lying on the flood fast asleep. It was still dark. Ed was already sitting in the cockpit and the Space X countdown could be heard coming from his phone: “…five, four, three, two, one, liftoff”!

Suddenly, It looked as though the sun was coming up over the horizon, but then in an explosion of orange and yellow,  the SpaceX Falcon 5-CRS-35 cargo mission rocket lifted into space. It was mesmerizing as the rocket rose, fire and gas settled in the sky creating an eerie yet beautiful formation and within it all colors of the spectrum glistened. For a moment the sky was the ocean with a giant jellyfish floating in ancient sea. Then we watched as the well behaved booster rocket returned to Zone 40 at Cape Caneral. Last, we were rattled from our meditative state by a tremendous sonic boom…What a way to wake up. Incredible…

Booster rocket returns to Cape Canaveral, IRL.

Without a doubt, this is a magical time, but along with this magic comes a cost as expressed in the article BLUE ORIGIN PLAN PUTS INDIAN RIVER LAGOON AT SIGNIFICANT RISK  —

For years, Brevard County has been anticipating and dealing with the positives and the negatives of Florida’s expanding Space Industry. In fact tomorrow, October 14, 2026  is the last day to comment  to the FAA. Link is here, should you wish to comment; notice below.

[Federal Register Volume 91, Number 187 (Tuesday, September 29, 2026)]
[Notices]
[Pages 61551-61552]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-19897]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

[FAA-2026-10792]


Office of Commercial Space Transportation; Notice of Intent To 
Prepare a Supplemental Environmental Impact Statement (SEIS) and Open a 
Public Scoping Period for the SpaceX Starship-Super Heavy Operations at 
Space Launch Complex 37 at Cape Canaveral Space Force Station, Cape 
Canaveral, Florida

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Notice of Intent to prepare a SEIS and notice of public scoping 
period.

-----------------------------------------------------------------------

SUMMARY:  In accordance with the National Environmental Policy Act of 
1969, as amended (NEPA), FAA Order 1050.1G, FAA National Environmental 
Policy Act Implementing Procedures, and Department of War (DoW) and 
Department of the Air Force (DAF) NEPA Implementing Procedures, FAA is 
announcing its intent to prepare a Supplemental Environmental Impact 
Statement (SEIS) concerning Space Exploration Technologies Corp.'s 
(SpaceX) proposal obtain a modification to their existing vehicle 
operator license from the FAA to authorize commercial Starship-Super 
Heavy operations at Space Launch Complex 37 (SLC-37) at Cape Canaveral 
Space Force Station (CCSFS). This SEIS supports FAA's adoption of the 
Final Environmental Impact Statement for the SpaceX Starship-Super 
Heavy Cape Canaveral Space Force Station (2025 DAF EIS), EIS 
Identification Number: EISX-007-057-USF-1730277197. The proposed 
operations would include up to 76 Starship-Super Heavy launches and up 
to 152 landings per year (up to 76 Super Heavy Booster and up to 76 
Starship vehicle landings), including return-to-launch-site (RTLS) and 
ocean landings. FAA is requesting comments concerning the scope and 
content of the SEIS. A Draft SEIS will be released for public review 
and comment later.

DATES:  FAA invites interested agencies, organizations, Native American 
Tribes, and members of the public to submit comments on alternatives or 
impacts and on relevant information, studies, or analyses with respect 
to the proposed agency action. The public scoping period starts with 
the publication of this Notice in the Federal Register. To ensure 
sufficient time to consider issues identified during the public scoping 
period, comments should be submitted by one of the methods listed under 
ADDRESSES no later than October 14, 2026. All comments will receive the 
same attention and consideration in the preparation of the SEIS.

ADDRESSES: Comments, statements, or questions concerning scoping issues 
must be identified with the Docket Number FAA-2026-10792 and may be 
provided to FAA as follows:
     Federal E-Rulemaking Portal: www.regulations.gov. Retrieve 
the docket by conducting a search for ``[FAA-2026-10792] and follow the 
online instructions for submitting comments. Please note that FAA will 
post all comments on the internet without changes, including any 
personal information provided.
     By U.S. mail to: Ms. Eva Long, FAA Environmental 
Protection Specialist, c/o ICF, 1902 Reston Metro Plaza, Reston, VA 
20190.
    We encourage the submission of comments electronically through the 
Federal E-Rulemaking Portal. If comments are submitted electronically, 
it is not necessary to also submit a hard copy. All comments received 
will be posted without change to http://www.regulations.gov.

SUPPLEMENTARY INFORMATION:

Background

    In 2025, the Department of the Air Force (DAF) completed the Final 
Environmental Impact Statement for the SpaceX Starship-Super Heavy Cape 
Canaveral Space Force Station (2025 DAF EIS) addressing the potential 
environmental impacts associated with the redevelopment of SLC-37 and 
Starship-Super Heavy launch and landing operations at CCSFS. The 2025 
DAF EIS analyzed up to 76 Starship-Super Heavy launches and 152 
landings per year (76 Super Heavy and 76 Starship landings). The 2025 
DAF EIS concluded that implementation of the Proposed Action, with 
mitigation and adaptive management measures, would not result in 
significant environmental impacts except for noise. The DAF issued a 
Record of Decision (ROD) authorizing SpaceX to undertake certain 
construction activities for Starship-Super Heavy operations, to conduct 
prelaunch operations, as well as conduct up to 76 launches and 152 
landings annually, pending supplementation of the Proposed Action with 
the temporary airspace closures and associated additional analysis by 
the FAA to support a follow-on decision from the DAF. FAA participated 
as a cooperating agency in the 2025 DAF EIS but did not issue a ROD, 
because SpaceX had not submitted a modification to their existing 
vehicle operator license from the FAA to authorize Starship-Super Heavy 
operations at SLC-37 at that time.
    Following DAF's issuance of its ROD, SpaceX began developing 
infrastructure at SLC-37 to support future Starship-Super Heavy 
operations. SpaceX must obtain modification to their existing vehicle 
operator license from FAA before conducting commercial Starship-Super 
Heavy launch and landing operations associated with SLC-37.
    The 2025 DAF EIS did not analyze temporary airspace closures, DOT 
Section 4(f) resources, or the proposed contingency landing area. The 
proposed contingency landing area is located in the Atlantic Ocean 
beginning 1 nautical mile (2 kilometers) or more from the coast and 
extending up to 50 miles (80 kilometers) north of KSC LC-39A and up to 
50 miles (80 kilometers) south of CCSFS SLC-37, which is the same area 
that was previously analyzed in the FAA 2026 Environmental Impact 
Statement for the SpaceX Starship-Super Heavy Launch Vehicle at Launch 
Complex 39A (LC-39A) at the Kennedy

[[Page 61552]]

Space Center (KSC), Merritt Island, Florida (FAA 2026 EIS). In 
addition, certain aspects of Starship RTLS operations, including a 
range of potential RTLS trajectories, were not previously analyzed. 
Accordingly, FAA is preparing this SEIS to supplement the 2025 DAF EIS 
by evaluating these and other environmental effects associated with 
FAA's proposed licensing action and incorporating by reference relevant 
existing environmental analyses, as appropriate.

Proposed Action

    FAA's Federal Action is to issue a modification to the existing 
vehicle operator license to authorize SpaceX to conduct Starship-Super 
Heavy operations associated with SLC-37 and issue, as appropriate, 
subsequent license modifications and renewals under 14 CFR part 400. 
FAA's Federal Action also includes FAA's issuance of temporary airspace 
closures.
    SpaceX's Proposed Action would include up to 76 Starship-Super 
Heavy launches and up to 152 landings per year, (up to 76 Super Heavy 
Booster and up to 76 Starship vehicle landings), including RTLS 
associated with SLC-37. The Proposed Action also includes ocean 
landings of Super Heavy in the Atlantic Ocean and Starship landings in 
the Atlantic, Pacific, and Indian Oceans, and the Gulf of America.

Alternatives

    FAA Order 1050.1G defines reasonable alternatives as those that are 
technically and economically feasible, meet the purpose and need for 
the Proposed Action, and, where applicable, meet the goals of the 
applicant. The 2025 DAF EIS established SLC-37 as an approved location 
for Starship-Super Heavy operations, and infrastructure to support 
those operations is already being developed. As such, no alternative 
launch sites meet the purpose and need for the Proposed Action. The 
SEIS will therefore evaluate the Proposed Action and the No Action 
Alternative.
    Under the No Action Alternative, FAA would not issue a modification 
to the existing vehicle operator license to authorize SpaceX to conduct 
commercial Starship-Super Heavy operations associated with SLC-37 and 
would not issue associated temporary airspace closures.
    More information on the SEIS can be found at: https://www.faa.gov/space/stakeholder_engagement/spacex_starship_ccsfs.
    Before including your address, phone number, email address, or 
other personal identifying information in your comment, be advised that 
your entire comment--including your personal identifying information--
may be made publicly available at any time. While you can ask FAA in 
your comment to withhold from public review your personal identifying 
information, FAA cannot guarantee that we will be able to do so. All 
comments received during the comment period will be given equal weight 
and be taken into consideration in the preparation of the SEIS.

Katie L. Cranor,
Executive Director, Office of Operational Safety.
[FR Doc. 2026-19897 Filed 9-28-26; 8:45 am]
BILLING CODE 4910-13-P

~AI Impact Summary:

  • The Gigabay: SpaceX is building a massive 380-foot integration and manufacturing facility known as the Gigabay—which has over eleven times the square footage of SpaceX’s current Megabay in Texas—slated to be operational by the end of 2026
  • Starship Launch Tower & Pads: Starship launch tower segments are actively arriving on site, and SpaceX has filed FAA license applications to launch its massive Starship rocket up to 76 times a year from Space Launch Complex 37 (SLC-37) at Cape Canaveral (with plans for up to 120 total annual launches from Cape Canaveral).
  • Infrastructure & Fuel: Construction is underway for supporting ground systems, including plans for a 32-mile natural gas pipeline to fuel Starship rockets on-site rather than relying on hundreds of truckloads of fuel.
  • Airport-Like Operations: SpaceX is working with federal regulators to transform its Florida pads into high-frequency, airport-like hubs supporting multiple daily launches.

    The space jellyfish effect – twilight phenomenon.